Back to Articles
How Much Does Renovation Cost in Hong Kong? Full Budget Breakdown by Flat Size
D
Decoration2 Editorial·Wondering how much your renovation will cost? We break down Hong Kong renovation costs by flat size — from 300 sq ft nano-flats to 1,000 sq ft family homes.
Hong Kong Renovation Cost Breakdown
Budget planning is the number-one concern for homeowners embarking on a renovation. This guide provides detailed cost breakdowns by flat size and renovation scope.
What Goes Into Renovation Costs
1. Design Fees
- Basic design consultation: Free to HK$5,000
- Full design with construction drawings: HK$10,000–30,000
- Premium interior design: HK$30,000–80,000+
2. Construction Costs
This is the largest component:
- Demolition & debris removal: HK$5,000–20,000
- Plumbing & electrical: HK$15,000–40,000
- Wet trades (tiling, plastering): HK$20,000–60,000
- Carpentry & joinery: HK$30,000–100,000+
- Painting: HK$8,000–25,000
- Sanitary ware installation: HK$10,000–30,000
3. Materials
Materials typically account for 30–40% of the total budget, including tiles, timber, paint, hardware, and sanitary fixtures.
Cost by Flat Size
300 sq ft
- Basic: HK$120,000–180,000
- Mid-range: HK$180,000–280,000
- High-end: HK$280,000+
500 sq ft
- Basic: HK$200,000–300,000
- Mid-range: HK$300,000–500,000
- High-end: HK$500,000+
700 sq ft
- Basic: HK$280,000–420,000
- Mid-range: HK$420,000–700,000
- High-end: HK$700,000+
1,000 sq ft
- Basic: HK$400,000–600,000
- Mid-range: HK$600,000–1,000,000
- High-end: HK$1,000,000+
Smart Ways to Save
- Use a matching platform — Get multiple competitive quotes through Decoration2
- Phase your renovation — Complete essentials first, upgrades later
- Choose value materials — Mid-range options often offer the best price-performance
- Minimize layout changes — Moving walls is expensive; work with what you have
- Source fittings yourself — Buy lights, handles, and accessories directly
Payment Schedule
A typical renovation payment plan looks like this:
- Contract signing: 30–40% deposit
- After plumbing/tiling: 30%
- After carpentry: 20%
- After inspection: 10–20% final payment
Important: Never pay the full amount upfront. Stage payments protect your interests.
Need help budgeting your renovation? Decoration2 matches you with contractors that fit your budget. Get started free!